Opinion and Order 85-2[PDF]
-, , ~ .l" ... - ~-: STATE OF NEW YO~ PUBLIC SERVICE COMMISSION OPINION NO. 85-2 CASE 70126 - POWER AUTHORITY OF THE STATE OF NEW YORK -Marcy-South 345 kV Transmission Facilities OPINION AND ORDER GRANTING CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED Issued: January 30, 1985 / ~, I •• I I $.- -. ... ;:. .. STATE OF NEW YORK PUBLIC SERVICE COMMISSION OPINION NO. 85-2 CASE 70126 - POWER AUTHORITYOF.THE STATE OF NEW YORK Marcy-South 345 kV Transmission Facilities OPINION AND
Download
Exhibit 1, Volume 1 of 3 - Page 295 - 577[PDF]
Because the Project has no alternate fuel, it will either purchase 365-day firm capacity or will be an intermptible customer. If gas supply to the Project is interrupted, Brookhaven Energy will cease to take deliveries. By so doing, the Project will comply with the PSC Interruptible Gas Service Order. 9.3 Gas Upgrade Environmental Assessment This section addresses Stipulation 4, Clause 3, which requires an assessment of environmental impacts of any upgrades as specified in other stipulations and preamble.
Download
H-71 NGrid email to DEC Region 5 1-26-15 (with attachments)[PDF]
1 Sciortino, Frank L. From: Sciortino, Frank L. Sent: Monday, January 26, 2015 9:26 AM To: 'jamie.zarczynski@dec.ny.gov' Subject: National Grid Mohican-Battenkill Project / SWPPP MS4 Review / Town of Moreau Bill, On January 20 th I met with the Town of Moreau to review an off ROW access proposal from Sisson Road to structures 9 and 10 on our Mohican-Battenkill transmission line. I met with the Town’s Building Inspector, Joe Patricke, and the Town’s consulting engineer, Garry Robinson. The meeting went well
Download
UWNY November 2013 Hydrant Report[XLSX]
MASTER 2013 TOWN_NAME TAGPREFIX HYDRANTNO Hydrant IX_STREET LOCATION SPRING VALLEY 1 1 1-1 RT 45 ES RT 45 500'N/O SNEDENS PL SPRING VALLEY 1 2 1-2 RT 45 ES N MAIN ST 175'S/O SNEDEN PL SPRING VALLEY 1 3 1-3 LINDEN NS LINDEN AVE 100'E/O GARDEN PL SPRING VALLEY 1 4 1-4 EWING NS EWING AVE 500'E/O N MAIN ST SPRING VALLEY 1 5 1-5 RT 45[ N MAIN ST] RT 45 20' N/O HOMER LEE AVE SPRING VALLEY 1 6 1-6 OHIO AVE OHIO AVE 800' E/O MAIN ST[ RT 45] SPRING VALLEY 1 7 1-7 OHIO N/S OHIO AVE -600' E/O MAIN ST (40' W/O PROSPECT
Download
{5996E00C-ABC1-40B9-BC0C-2F2474FAAEDB}[PDF]
TOM REED 29th District, New York COMMITTEE ON WAYS AND MEANS subcommittees: Human Resources Oversight washington, dc office 1037 Longworth House Office Building Washington, DC 20515-3229 Phone:(202)225-3161 www.reed.house.gov Ijmtsc ofSqiresimtatuics Btudftagtai, Bit2A515 June 21, 2013 The Honorable Gary A. Brown Chairman New York State Public Service Commission 3 Empire State Plaza Albany, NY 1223-1350 Dear Chairman Brown, corning districtoffice 89West Market Street Corning, NY 14830 Phone: (607) 654-7566
Download
Annual Asset Condition Report-Request for protected treatment[PDF]
REPORT ON THE CONDITION OF PHYSICAL ELEMENTS OF TRANSMISSION AND DISTRIBUTION SYSTEMS CASE 06-M-0878 PREPARED FOR: THE STATE OF NEW YORK PUBLIC SERVICE COMMISSION THREE EMPIRE STATE PLAZA ALBANY, NY 12223 OCTOBER 1, 2012 Table of Contents 1. Executive Summary A. Asset Condition Chapter 2 1 B. System Capacity and Performance Chapter 3 6 C. Organization of the Filing 8 2. Asset Condition A. Transmission System 9 B. Sub-Transmission System 76 C. Distribution System
Download
Draft Environmental Impact Statement for Flat Rock Wind Power Project.[PDF]
TOWN OF MARTINSBURG PO BOX 8 HARTINSBURG NY 13404 1803-2003 Phone:(315) 376-2299 Fax: (315) 376-8722 TDD 1-800-662-1220 Email: mburg@usadatanet.net Supervisor Terrence Thisse Highway Sup't: Carl Morrison (315) 376-2309 Town Clerk: MaiyKelley ^e^HT RZ-^S December 3, 2003 Interested or Involved Agency co-^r-os^ RE: Flat Rock Wind Power Project; Draft Environmental Impact Statement Notice of Completion of DEIS and SEQR Hearing A copy of the Draft Environmental Impact Statement (DEIS) for the Flat Rock
Download
Results of UWNY November 2009 Hydrant Servicing.[PDF]
TOWN_NAME TagPrefix NO. IX_STREET SPRING VALLEY 1 1R T 45 SPRING VALLEY 1 2 RT 45 SPRING VALLEY 1 3 LINDEN SPRING VALLEY 1 4 EWING SPRING VALLEY 1 5 RT 45 SPRING VALLEY 1 6 OHIO SPRING VALLEY 1 7 OHIO SPRING VALLEY 1 8 BETHUN SPRING VALLEY 1 9 BETHUN SPRING VALLEY 1 10 ROSE SPRING VALLEY 1 11 RT 45 SPRING VALLEY 1 12 COLUMB SPRING VALLEY 1 13 MAPLE SPRING VALLEY 1 14 RT 45 SPRING VALLEY 1 15 RT 45 SPRING VALLEY 1 16 GROVE SPRING VALLEY 1 17 CHURCH SPRING VALLEY 1 18 JACKSO SPRING VALLEY 1 19 COMMER SPRING V
Download
Capital Investment Plan Report FY2013 Q2[PDF]
Carlos A. Gavilondo Senior Counsel II November 15, 2012 Via Electronic Filing Honorable Jaclyn A. Brilling, Secretary State of New York Public Service Commission Office of the Secretary Three Empire State Plaza Albany, NY 12223-1350 Re: Case 10-E-0050 – Proceeding on Motion of the Commission as to the Rates, Charges, Rules and Regulations of Niagara Mohawk Power Corporation for Electric Service – National Grid’s Capital Investment Plan Report for Second Quarter of Fiscal Year 2013 Dear Secretary
Download
FY14 Q1 capital investment plan report[PDF]
300 Erie Blvd. West, Syracuse, New York 13202 T: 315/428-5862 � F: 315/ 428-5355 � carlos.gavilondo@nationalgrid.com � www.nationalgrid.com September 30, 2013 Via Electronic Filing Honorable Kathleen H. Burgess, Secretary New York State Department of Public Service 3 Empire State Plaza, 19 th Floor Albany, NY 12223-1350 Re: Case 10-E-0050 – Proceeding on Motion of the Commission as to the Rates, Charges, Rules and Regulations of Niagara Mohawk Power Corporation for Electric Service – Natio
Download
Evidentiary Hearing Exhibit 4 - Environmental Impacts (Exhibit 4 to the Application)[PDF]
Champlain Hudson Power Express Project Exhibit 4 Environmental Impacts Case No. 10-T-0139 Hearing Exhibit 4 Page 1 of 351 Champlain Hudson Power Express, Inc. i Exhibit 4: Environmental Impacts Champlain Hudson Power Express Project Article VII Application EXHIBIT 4 ENVIRONMENTAL IMPACTS TABLE OF CONTENTS EXHIBIT 4: ENVIRONMENTAL IMPACTS..................................................................4-1 4.1 CONSTRUCTION AND OPERATIONAL PROCEDURES.....................................4-1
Download
2015-06-04 - PS Rebuttal - TD Captial Budget - EXHIBIT___CBP-REB-3[PDF]
EXHIBIT_��(CBP-REB-3) RELEVANT DISCOVERY RESPONSES REFERENCED IN THE REBUTTAL TESTIMONY OF TRANSMISSION AND DISTRIBUTION CAPITAL BUDGET PANEL Page 1 of 3 PSEG Long Island Case Name: PSEG LI - Rate Case 2015 Docket No(s): Matter No. 15-00262 Response to Discovery Request: DPS-CBP-0372 Date of Response: 04/20/2015 Witness: CAPITAL BUDGETS Question: The exhibits of the Capital Budgets Panel contain information that does not appear to be consistent with information contained in the exhibits
Download
Exhibit 2 Vol. 2[PDF]
Ex z, \/oi. Z. m n o o' D 00 00 •a _o New York Power Authority - Combined Cycle Project Article X Application 8.0 AQUATIC RESOURCES This section demonstrates that the proposed Combined Cycle Project's cooling system and discharge of low-volume waste streams, including stormwater, will be in compliance with the Federal Clean Water Act (CWA), the New York Code of Rules and Regulations (NYCRR) Part 704, the Federal Endangered Species Act and the Sustainable Fisheries Act. A description of the aquatic co
Download
Book 1 Testimony and Exhibits[PDF]
National Grid Niagara Mohawk Power Corporation PROCEEDING ON MOTION OF THE COMMISSION AS TO THE RATES, CHARGES, RULES AND REGULATIONS FOR ELECTRIC SERVICE CORRECTIONS & UPDATES FILING Testimony and Exhibits of: Rudolph L. Wynter, Jr. Andrew E. Dinkel III Maureen P. Heaphy Alfred P. Morrissey, Jr. Andrew F. Sloey Infrastructure and Operations Panel Book 1 May 3, 2010 Submitted to: New York Public Service Commission Docket No. 10-E-0050 Submitted by: Testimony of Rudolph L. Wynter, Jr.
Download
Exhibit 10- 3-16-09[PDF]
EXHIBIT ll iiiiH NYRI nm^WKMnm m —| w NEW YORK REGIONAL INTERCONNECT INC. NEW YORK REGIONAL INTERCONNECTION EXHIBIT E-l DESCRIPTION OF PROPOSED TRANSMISSION LINES AND CABLES •Illlli; NYRI TABLE OF CONTENTS SECTION PAGE EXHIBIT E-l DESCRIPTION OF PROPOSED TRANSMISSION LINES AND CABLES 1 E-l.l DC Transmission Line 1 E-l.1.1 DC Transmission Line Structures 1 E-l.1.1.1 DC Transmission Line Structures within Railroad Properties 1 E-l.1.1.2 DC Transmission Line Structures outside Railroad Properties
Download
Annual T&D 5-year capital investment plan[PDF]
TRANSMISSION AND DISTRIBUTION CAPITAL INVESTMENT PLAN CASE 10-E-0050 PREPARED FOR: THE STATE OF NEW YORK PUBLIC SERVICE COMMISSION THREE EMPIRE STATE PLAZA ALBANY, NY 12223 JANUARY 31, 2013 Table of Contents 1. Executive Summary 1 A. Capital Investment Plan Summary 2 B. Investment by System 6 C. Opportunities and Challenges 8 D. Developing the Capital Investment Plan 10 E. Organization of this Filing 11 2. Transmission System 12 A. Statutory or Regulatory
Download
May 2015 Hydrant Report[XLSX]
MASTER 2015 TOWN_NAME TAGPREFIX HYDRANTNO Hydrant Number IX_STREET LOCATION DATE_IN_SERVICE STATUS UNITED_WATER_HYDRANT TOWN_NAME SPRING VALLEY 1 1 1-1 RT 45 ES RT 45 500'N/O SNEDENS PL 2 SPRING VALLEY SPRING VALLEY 1 2 1-2 RT 45 ES N MAIN ST 175'S/O SNEDEN PL 2 SPRING VALLEY SPRING VALLEY 1 3 1-3 LINDEN NS LINDEN AVE 100'E/O GARDEN PL 2 SPRING VALLEY SPRING VALLEY 1 4 1-4 EWING NS EWING AVE 500'E/O N MAIN ST 2 SPRING VALLEY SPRING VALLEY 1 5 1-5 RT 45[ N MAIN ST] RT 45 20' N/O HOMER LEE AVE 2 SPRING V
Download
National Grid Corrected Capital Investment Report[PDF]
National Grid Capital Investment Plan NY PSC Case 10-E-0050 FY13 –First Quarter –Submitted August 2012 This document has been reviewed for Critical Energy Infrastructure Information (CEII). 8/22/2012 This document has been reviewed for Critical Energy Infrastructure Information (CEII). 8/22/2012 Table of Contents Executive Summary...................................................Page 1 Budget Variance Reports................................................Page 13 Summary.................................
Download
Part 1 of DPS IRs Combine[PDF]
1 Central Hudson Gas and Electric Corporation A&C REBUILD PROJECT - ARTICLE VII APPLICATION Case 13-T-0469 INTERROGATORY/DOCUMENT REQUEST Requesting Party and No.: DPS Staff - DPS-001 (MS) Central Hudson Response No: CHGE-001 (DPS) Date of Request: 4/23/2014 Information Requested of: Central Hudson Gas and Electric Corporation Reply Date: May 5, 2014 Response Provided by: Christopher Rottkamp (1, 3, 4, 8, 9, 13, 14, 19, and 20) Jose Ruaya (5, 7, 10, 11, 16, 18) John Hecklau (2, 6, 12, 15, 17,
Download
Exhibit 31 3/16/09[PDF]
NYRI EXHIBIT NEW YORK REGIONAL INTERCONNECTION DEPARTMENT OF PUBLIC SERVICE (DPS) INTERROGATORIES, DEFICIENCIES AND STIPULATIONS APPENDIX R 3 /^ Table 1. Department of Public Service (DPS), Interrogatory Description, Response Location and Witness Panel Interrogatory Request # DPS1 DPS 2 DPS 3 DPS 4 1. Please provide, in digital format, all input files used in the MARS modeling referenced in Exhibit E-4 of the Article VII application. Also provide all calculations that support NYRI's claim regardi
Download
FY14 Q4 cap ex report[PDF]
300 Erie Blvd. West, Syracuse, New York 13202 T: 315/428-5862F: 315/401-7891carlos.gavilondo@nationalgrid.com �� www.nationalgrid.com June 16, 2014 Via Electronic Filing Honorable Kathleen H. Burgess, Secretary New York State Department of Public Service 3 Empire State Plaza, 19 th Floor Albany, NY 12223-1350 Re: Case 12-E-0201 – Proceeding on Motion of the Commission as to the Rates, Charges, Rules and Regulations of Niagara Mohawk Power Corporation d/b/a National Grid for Electric Ser
Download
Part 2 of Exhibit 1 [PDF]
AO O Kh\b\t WAWAYANDA ENERGY CENTER, LLC APPLICATION FOR CERTIFICATE PURSUANT TO ARTICLE X OF THE PUBLIC SERVICE LAW Case No. 00-F-1256 JOINT STIPULATIONS EXHIBIT BINDER (EXHIBIT 1, Vol. 4) Exhibit Binder IV May 2002 igWfH^^PM^iiipiiiipu.^^ WAWAYANDA ENERGY CENTER VOLUME IV APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AND PUBLIC NEED PURSUANT TO ARTICLE X OF THE NEW YORK STATE PUBLIC SERVICE LAW SUBMITTED BY Wawayanda Energy Center, LLC (a subsidiary of Calpine Corporation)
Download
2014 Capital Investment Plan[PDF]
300 Erie Blvd. West, Syracuse, New York 13202 T: 315/428-5862F: 315/ 401-7891carlos.gavilondo@nationalgrid.com �� www.nationalgrid.com VIA ELECTRONIC DELIVERY January 31, 2014 Hon. Kathleen H. Burgess, Secretary New York State Department of Public Service 3 Empire State Plaza Albany, New York 12223-1350 Re: Case 10-E-0050, Proceeding on Motion of the Commission as to the Rates, Charges, Rules and Regulations of Niagara Mohawk Power Corporation d/b/a National Grid for Electric Service
Download
Exhibit 115 Local Laws C of Saratoga Springs[PDF]
THE CHARTER CHAPTER C. CHARTER THE CODE PART I, ADMINISTRATIVE LEGISLATION CHAPTER 1. GENERAL PROVISIONS CHAPTER 6. ASSESSOR CHAPTER 8. CODE ADMINISTRATION CHAPTER 8A. CONTRACTS CHAPTER 9. DEFENSE AND INDEMNIFICATION CHAPTER 13. ETHICS, CODE OF CHAPTER 15. FINGERPRINTING OF CITY PERSONNEL CHAPTER 16. (RESERVED) CHAPTER 19. DESIGN REVIEW COMMISSION CHAPTER 28. PUBLICATION OF ORDINANCES CHAPTER 30. (RESERVED) CHAPTER 34. PLANNING BOARD CHAPTER 36. POLICE DEPARTMENT CHAPTER 38. RECREATION COMMISSION CHAPTER 4
Download
Quarterly Capital Investment Report[PDF]
300 Erie Blvd. West, Syracuse, New York 13202 T: 315/428-5862F: 315/401-7891carlos.gavilondo@nationalgrid.com �� www.nationalgrid.com November 14, 2014 Via Electronic Filing Honorable Kathleen H. Burgess, Secretary New York State Department of Public Service 3 Empire State Plaza, 19 th Floor Albany, NY 12223-1350 Re: Case 12-E-0201 – Proceeding on Motion of the Commission as to the Rates, Charges, Rules and Regulations of Niagara Mohawk Power Corporation d/b/a National Grid for Electric
Download
Annual Asset Condition Report-REDACTED[PDF]
October 1, 2012 Carlos A. Gavilondo Senior Counsel II Via Electronic Filing Hon. Jaclyn A. Brilling Secretary to the Commission New York State Public Service Commission Empire State Plaza Agency Building 3 Albany, NY 12223-1350 Re: Case 06-M-0878 – Joint Petition of National Grid PLC and KeySpan Corporation for Approval of Stock Acquisition and Other Regulatory Authorizations – Annual Asset Condition Report Filing by Niagara Mohawk Power Corporation d/b/a National Grid Dear Secretary Brilling: Purs
Download
Response to DPS 001 to DPS 027[PDF]
CASE 13-T-0469 DPS Staff Interrogatories DPS-001 to DPS-027 with Central Hudson responses. Submitted as an evidentiary exhibit to support the Joint Proposal filed February 6, 2015. 1 Central Hudson Gas and Electric Corporation A&C REBUILD PROJECT - ARTICLE VII APPLICATION Case 13-T-0469 INTERROGATORY/DOCUMENT REQUEST Requesting Party and No.: DPS Staff - DPS-001 (MS) Central Hudson Response No: CHGE-001 (DPS) Date of Request: 4/23/2014 Information Requested of: Central Hudson Gas and Electric Cor
Download
Exhibit 30 3/16/09[PDF]
Analysis of the Potential Cumulative impact of the Facilities of the Millennium Pipeline Company, L.L.C. and the New York Regional Interconnection NEW YORK STATE PREPARED FOR •lliro iiiii NYRI (ton >bf% ftt«io(i*l (mcfunrwcUMi New York Regional Interconnect 100 State Street, Suite 1033 Albany, New York 12207-1800 PREPARED BY Turouplnc. ESS Group, Inc. 401 Wampanoag Trail, Suite 400 East Providence, Rhode Island 02915 ESS Project No. P252-009.2 February 2008 ANALYSIS OF THE POTENTIAL CUMULATIVE IMP
Download
Results Pertaining to Hydrant Servicing & Other Hydrant Related Issues[XLSX]
MASTER 2014 TOWN_NAME TAGPREFIX HYDRANTNO Tag IX_STREET LOCATION DATE_IN_SERVICE STATUS TOWN_NAME SPRING VALLEY 1 1 , RT 45 ES RT 45 500'N/O SNEDENS PL 2 SPRING VALLEY SPRING VALLEY 1 2 1-2 RT 45 ES N MAIN ST 175'S/O SNEDEN PL 2 SPRING VALLEY SPRING VALLEY 1 3 1-3 LINDEN NS LINDEN AVE 100'E/O GARDEN PL 2 SPRING VALLEY SPRING VALLEY 1 4 1-4 EWING NS EWING AVE 500'E/O N MAIN ST 2 SPRING VALLEY SPRING VALLEY 1 5 1-5 RT 45[ N MAIN ST] RT 45 20' N/O HOMER LEE AVE 2 SPRING VALLEY SPRING VALLEY 1 6 1-6 OHIO AVE OH
Download
Hearing Exhibit 4_RARP_Environmental Impact[PDF]
Rochester Gas and Electric Corporation Exhibit 4: Environmental Impacts Rochester Area Reliability Project Article VII Application Rochester Gas and Electric Corporation Rochester Area Reliability Project Exhibit 4 Environmental Impacts Rochester Gas and Electric Corporation Exhibit 4: Environmental Impacts Rochester Area Reliability Project Article VII Application 4-i TABLE OF CONTENTS Section Page EXHIBIT 4: ENVIRONMENTAL IMPACTS ........................................................
Download
Hydrant Filing for United Water[PDF]
TOWN_NAME TagPrefix NO. IX_STREET GRANDVIEW 12 1 RIVER RD HAVERSTRAW (VILLAGE) 71 5 LONG CLOVE HAVERSTRAW (VILLAGE) 71 21 MAIN ST AN HAVERSTRAW (VILLAGE) 71 50 CLOVE HAVERSTRAW (VILLAGE) 71 118 MAPLE AVE MONSEY 2 428 MILTON PL NANUET 4 20 MAIN NANUET 4 59 HUTTON NANUET 4 88 EDSALL NANUET 4 337 WEDGEW NANUET 20 22 RT 304 NEW HEMPSTEAD 41 32 NEW HEMP ORANGEBURG 7 1 WESTERN HIGHWAY ORANGEBURG 7 2 ORANGEBURG RD ORANGEBURG 7 20 ISABEL ORANGEBURG 7 87 RT 303 ORANGEBURG 7 105 ORANGEBURG RD PALISADES 10 3 RT 9W PAL
Download
Evidentiary Hearing Exhibit 121 (Part 2 of 4) - Revised Environmental Impacts Report 2012[PDF]
Champlain Hudson Power Express Project Environmental Impacts References - 36 Town of Fort Edward. 2002. Town of Fort Edward Master Plan and Final Generic Environmental Impact Statement. Adopted May 13, 2002. Accessed online January 26, 2010 at: http://wwww.fortedwardnewyork.net/zoning/zoning.html. Town of Glenville. 2004. Town of Glenville Freeman’s Bridge Road Master Plan. June 16, 2004. Accessed online February 1, 2010 at: http://74.125.93.132/search?q= cache:I92HU5cNRHQJ:www.townofglenville.org/Public_Do
Download
11/2011 Hydrant report - spreadsheet[XLSX]
MASTER 2011 TOWN_NAME TagPrefix NO. IX_STREET LOCATION COMMENTS AIRMONT 28 1 VAN ORD N/S VAN ORDEN AVE 25'E/O BROOKSIDE AVE AIRMONT 28 2 VAN DY WS VAN DYKE AVE 25'N/O HASKELL AVE AIRMONT 28 80 PADDOCK LA W/S PADDOCK LA - 50' NCL CAMPBELL AVE AIRMONT 30 3 RT 59 S/S RT 59 - 375' E/O NEW COUNTY ROAD AIRMONT 30 4 RT 59 SS RT 59 40'W/O COLLEGE RD AIRMONT 30 5 RT 59 SS RT59 650'W/O NEW COUNTY RD AIRMONT 30 6 RT 59 S/S RT 59 OPP TALL PINES IND. PARK E/O CHERRY LA AIRMONT 30 7 RT 59 SS RT 59 600'E/O CHERRY LA AIRMO
Download
Q3 FY12 Redacted.[PDF]
National Grid Capital Investment Plan NY PSC Case 10-E-0050 FY12 – Third Quarter – Submitted February 2012 This document has been redacted for Critical Energy Infrastructure Information (CEII). 2/15/2012 This document has been redacted for Critical Energy Infrastructure Information (CEII). 2/15/2012 Table of Contents Executive Summary...................................................Page 1 Budget Variance Reports................................................Page 14 Summary......................
Download
Exhibit 48 NYC Rules Part 5[PDF]
148 of 198 DOCUMENTS Rules of the City of New York Copyright 2010 New York Legal Publishing Corporation a New York Corporation All Rights Reserved ***** Current through December 2009 **** 48 RCNY 3-103 RULES OF THE CITY OF NEW YORK Title 48 Office of Administrative Trials and Hearings (OATH) CHAPTER 3*6 ENFORCEMENT PROCEDURES BEFORE THE ENVIRONMENTAL CONTROL BOARD SUBCHAPTER G*7 PENALTIES §3-103 Buildings Penalty Schedule. BUILDINGS PENALTY SCHEDULE Buildings Penalty Schedule I: Effective For Notices of Vio
Download
Company's November 2008 filing[XLSX]
Master List TagPrefix NO. TOWN_NAME IX_STREET LOCATION 1 1 SPRING VALLEY RT 45 ES RT 45 500'N/O SNEDENS PL 1 2 SPRING VALLEY RT 45 ES MAIN ST 175'S/O SNEEDEN PL 1 3 SPRING VALLEY LINDEN NS LINDEN AVE 100'E/O ORCHARD PL 1 4 SPRING VALLEY EWING NS EWING AVE 500'E/O MAIN ST 1 5 SPRING VALLEY RT 45 RT 45 20' N/O HOMER LEE AVE 1 6 SPRING VALLEY OHIO OHIO AVE 800' E/O MAIN ST 1 7 SPRING VALLEY OHIO N/S OHIO AVE -600' E/O MAIN ST 1 8 SPRING VALLEY BETHUN BETHUNE BLVD 1000' S/O EWING AVE 1 9 SPRING VALLEY BETHUN BE
Download
{297C8D6C-3E51-4214-A6FD-A2871BD3D149}[PDF]
To: New York Public Service Commission Let’s build on New York’s solar success. I urge the PSC to approve the New York State Energy Research and Development Authority’s (NYSERDA) recent petition to extend the NY-Sun Initiative through 2023. Signed by 10,418 people: Name Postcode Address Raina Russo 11509 123 Bayside Drive Josh Nelson 20009 2637 16th Street John Baldwin 10016 223 East 28th St., New York, NY Josh Romano 10001 276 5th Ave Marisa Bartolucci 10001 252 7th Avenue, Apt 9N Murshed Zaheed 94105 101
Download
Exhibit 4[PDF]
Cricket Valley Transmission Line and Re-conductoring Project Volume 2: Additional Exhibits December 30, 2013 Submitted by: Cricket Valley Energy Center, LLC 31 Milk Street, Suite 1001 Boston, Massachusetts 02109 Prepared by: Epsilon Associates, Inc. 3 Clock Tower Place, Suite 250 Maynard, Massachusetts 01754 New York Public Service Commission - Article VII Application Cricket Valley Transmission Line and Re-conductoring Project Exhibit 4 Environmental Impacts Cricket Valley Energy Cen
Download
Exhibit 48 - Local Laws - Saratoga Springs Local Law with attachments[PDF]
THE CHARTER CHAPTER C. CHARTER THE CODE PART I, ADMINISTRATIVE LEGISLATION CHAPTER 1. GENERAL PROVISIONS CHAPTER 6. ASSESSOR CHAPTER 8. CODE ADMINISTRATION CHAPTER 8A. CONTRACTS CHAPTER 9. DEFENSE AND INDEMNIFICATION CHAPTER 13. ETHICS, CODE OF CHAPTER 15. FINGERPRINTING OF CITY PERSONNEL CHAPTER 16. (RESERVED) CHAPTER 19. DESIGN REVIEW COMMISSION CHAPTER 28. PUBLICATION OF ORDINANCES CHAPTER 30. (RESERVED) CHAPTER 34. PLANNING BOARD CHAPTER 36. POLICE DEPARTMENT CHAPTER 38. RECREATION COMMISSION CHAPTER 4
Download
Description and Location of Facility[PDF]
1 DESCRIPTION AND LOCATION OF FACILITY General Project Description Cricket Valley Energy Center, LLC (“Certificate Holder”) is proposing to: (1) develop a new approximately 14.6-mile 345 kV transmission line parallel to the existing Consolidated Edison Company of New York, Inc.’s (“Con Edison”) 345 kV Transmission Line 398 (“Line 398”) from the planned Cricket Valley Switching Station (“Cricket Valley Switching Station”) in the Town of Dover, New York to Con Edison’s Pleasant Valley Substation in the T
Download
Exhibit 48 - Master Plans - New York State Open Space Plan[PDF]
David A. Paterson, Governor Lead Agencies: The Department of Environmental Conservation (DEC) Alexander B. Grannis, Commissioner The Office of Parks, Recreation and Historic Preservation (OPRHP) Carol Ash, Commissioner Partnering Agencies: The Department of Agriculture & Markets The Department of Transportation The Department of State DEFINITION OF OPEN SPACE Open space is defined as land which is not intensively developed for residential, commercial, industrial or institution
Download
Proofs of Publication [PDF]
MWfXs axrry-e^Q May 9, 2002 State of New York Department of Public Service Three Empire State Plaza Albany, NY 12223-1350 RE: Case No. 01-E-0359 - Newspaper Publication RECEIVED MAY 14 2002 Office ol Hearings and Alternative Dispute Resolution Dear Commissioners: In compliance with the rules and regulations of the Public Service Commission, New York State Electric and Gas Corporation ("NYSEG") advises that notice of its tariff filing in compliance with the Public Service Commission's Order Adopting P
Download
FY16-20 CIP_01302015_case_12-E-0201[PDF]
300 Erie Blvd. West, Syracuse, New York 13202 T: 315/428-5862F: 315/401-7891carlos.gavilondo@nationalgrid.com �� www.nationalgrid.com VIA ELECTRONIC DELIVERY January 30, 2015 Hon. Kathleen H. Burgess, Secretary New York State Department of Public Service 3 Empire State Plaza Albany, New York 12223-1350 Re: Case 12-E-0201, Proceeding on Motion of the Commission as to the Rates, Charges, Rules and Regulations of Niagara Mohawk Power Corporation d/b/a National Grid for Electric Service;
Download
Exhibit 4 - Environmental Impacts[PDF]
Champlain Hudson Power Express Project Exhibit 4 Environmental Impacts Champlain Hudson Power Express, Inc. i Exhibit 4: Environmental Impacts Champlain Hudson Power Express Project Article VII Application EXHIBIT 4 ENVIRONMENTAL IMPACTS TABLE OF CONTENTS EXHIBIT 4: ENVIRONMENTAL IMPACTS..................................................................4-1 4.1 CONSTRUCTION AND OPERATIONAL PROCEDURES.....................................4-1 4.1.1 Construction Methods........................
Download
Appendix F - Wildlife Species List[PDF]
WILDLIFE SPECIES INVENTORY Based on existing data, on-site surveys, and/or the availability of suitable habitat, the following species could occur in the project area at some time during the year: Common Name Scientific Name Herons, Bitterns Ardeidae 1,2 great blue heron Ardea herodias 2 green heron Butorides virescens 2 double crested cormorant Phalacrocorax auritus Waterfowl Anatidae 2 wood duck Aix sponsa 2 mallard Anas platyrhynchos 2 American black duck Anas rubripes 2 Canada goose Branta canadensis 2
Download
National Grid 2010 Transmission and Distribution Capital Investment Plan.[PDF]
TRANSMISSION AND DISTRIBUTION CAPITAL INVESTMENT PLAN CASE 06-M-0878 PREPARED FOR: THE STATE OF NEW YORK PUBLIC SERVICE COMMISSION THREE EMPIRE STATE PLAZA ALBANY, NY 12223 J ANUARY 29, 2010 TABLE OF CONTENTS i TABLE OF CONTENTS I. EXECUTIVE SUMMARY A. CAPITAL INVESTMENT PLAN BACKGROUND.................................................I-2 B. TRANSMISSION SYSTEM................................................................................I-5 C. SUB-TRANSMISSION SYSTEM..
Download
E Cubed Company on behalf of the Joint Supporters wished to intervene[XLS]
Master Hydrant List TagPrefix NO. Town Street Location 1 1 SPRI RT 45 ES RT 45 500'N/O SNEDENS PL 1 2 SPRI RT 45 ES MAIN ST 175'S/O SNEEDEN PL 1 3 SPRI LINDEN NS LINDEN AVE 100'E/O ORCHARD PL 1 4 SPRI EWING NS EWING AVE 500'E/O MAIN ST 1 5 SPRI RT 45 RT 45 20' N/O HOMER LEE AVE 1 6 SPRI OHIO OHIO AVE 800' E/O MAIN ST 1 7 SPRI OHIO N/S OHIO AVE -600' E/O MAIN ST 1 8 SPRI BETHUN BETHUNE BLVD 1000' S/O EWING AVE 1 9 SPRI BETHUN BETHUNE BLVD 150' S/O BARNES ST 1 10 SPRI ROSE ROSE AVE 300' S/O EWING AVE 1 11 SPR
Download